· Site Inspection
/ Client Meeting
· Township Ordinance Review
·
Township Supervisor Coordination
· Environmental
Site Investigation Report & Base Plan Mapping
· Preliminary
Site Sketch
· Legal Coordination with Environmental Attorney
·
Preliminary Geotechnical Soil Borings for Initial Application
·
Detailed Geotechnical Soil Borings with Report for Foundation Support
·
Wetlands Mapping
· Land Title Survey
(ALTA/ACSM)
· Topographic Survey (Existing Features Plan)
·
Utilities Survey
· Aerial Mapping
·
Phase I Environmental Site Assessment (if lender required)
·
Erosion & Sedimentation Plans
· NPDES
Permit (greater than 1-acre disturbed)
· Stormwater Infiltration
Testing
· Concrete Sub-Grade Foundation Verification
·
Structural Engineering Design & Inspection
· Zoning
Approvals
· Preliminary and Final Land Development Approvals
· Environmental Impact Study