• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

Call Us Today: 610-692-5770

Serving PA, NJ, DE, NY & Beyond

  • Facebook
  • Instagram
  • LinkedIn
  • Twitter
Brickhouse Environmental

Brickhouse Environmental

Sound Science. Trusted Advice.

  • Home
  • About Us
    • History
    • Principal Bios
    • Senior Management Staff
    • Careers
    • Giving Back
    • The Golden Brick
  • Services
    • Site Remediation
    • Environmental Due Diligence
    • Solid Waste Management
    • PFAS
    • Water Resource Management
    • Expert Testimony/Litigation Support
    • Heating Oil Clean-ups
    • Risk Assessment
    • Industrial Compliance
  • Projects
    • Gallery
  • News
    • Technical Articles
  • Resources
  • Contact Us
    • Request Brickhouse Vault Access

Historic Fill

August 7, 2018

Uncovering historic fill findings can be an unwanted surprise for a real estate development project. The need for unexpected testing and possible landfill disposal can crush a project budget. However, with proper due diligence and planning, you can avoid unexpected delays and costs.

What is Historic Fill?
Historic Fill is non-indigenous material that was previously placed on a property in order to raise the topographic elevation of the site. The fill material was typically imported from offsite, and had nothing to do with the operations conducted onsite. The material generally contains mixtures of soil and residuals, including coal or wood ash, foundry sands, construction or demolition debris, and/or dredge spoils. The source of the material is usually undocumented, and problems arise because it is often contaminated by residual metals and/or hydrocarbon compounds at concentrations exceeding regulatory cleanup standards.

Since historic fill is not federally regulated, various state agencies have developed their own specific definitions for “historic fill” in their states, and they have differing requirements for its management and remediation. Pennsylvania and New Jersey have some of the more robust regulations and policies on historic fill, but their approaches are very different. It is important to know the differences (see below).

How to Limit Surprises
Proper environmental due diligence (a Phase I ESA) should identify whether there is the potential for contaminated historic fill to be present on a property. If the potential is identified, Phase II sampling and analysis can confirm whether fill is contaminated, and whether it falls under that state’s definition of historic fill.

Historic fill is often found in urban locations, but can be found in suburban and rural locations, as well. The approach for assessing the fill should be site-specific, based on the project goals and design, geotechnical considerations, and State-specific regulations.

For instance, often times a site will have soil/fill material that is not physically suitable for constructing a building, based on a geotechnical study. The unsuitable soil/fill is shipped offsite. If this fill is classified as contaminated historic fill, it would need to be sent to a permitted landfill, at a cost of tens of thousands to hundreds of thousands of dollars. This could obviously cause major project delays and cost overruns. However, if this issue was identified during due diligence, the problem could have been avoided, or renegotiated upfront.

Different States Have Different Requirements
In most states, including Pennsylvania and New Jersey, there is no regulatory requirement to physically remove contaminated historic fill from the property. It can remain onsite. However, between these two states, not only is historic fill defined differently, but there can be significant differences in how the fill can be managed onsite, potential residual liabilities, and ongoing reporting and care obligations. Here are some highlights:

New Jersey

The biggest difference between Pennsylvania and New Jersey is that, as currently defined by statute, historic fill meets the definition of a discharge within New Jersey’s Spill Compensation and Control Act (N.J.S.A. 58:10-23.11), and therefore requires remediation.

Based on this requirement for remediation, the NJDEP has enacted regulations (N.J.A.C. 7:26E-5.4 and the NJDEP Historic Fill Material Technical Guidance Document) detailing requirements for the investigation and remediation of historic fill. Consistent with New Jersey Technical Regulations, a series of reporting and administrative filings will also be required to document the presence, delineation, remediation, and certifications for remediation of historic fill. In addition, the reporting and filings are required to be approved and signed by a Licensed Site Remediation Professional (LSRP) registered in the State of New Jersey.

There is flexibility in selecting the remedial strategy, and it can be tailored to property uses (i.e. residential vs. industrial use). The fill can be left onsite, if desired, by “remediating” through the use of engineering controls (e.g. capping at residential establishments), or institutional controls (e.g. deed notice), and a Soil Remediation Permit to ensure the continued protectiveness of the engineering control. But even this simplest of remedial strategies still requires a full delineation of the historic fill, the previously referenced administrative filings, and long-term reporting and care obligations until the controls and Remedial Action Permit are removed.

It should also be noted that New Jersey’s “Brownfield and Contaminated Site Remediation Act” requires the NJDEP to map regions of the state where large areas of historic fill exist and make this information available to the public. These maps are currently available, which is useful in conducting due diligence prior to purchase of a property, but can have other implications if you already own the property.

Pennsylvania

The management and handling of all fill material in Pennsylvania is regulated by the PADEP’s Management of Fill Policy (August 7, 2010). In this policy, defined classes of fill material include clean fill, regulated fill, and historic fill. The biggest differences between Pennsylvania and New Jersey are that, in Pennsylvania:

–      there is no obligation to remediate historic fill, and

–      the State has not mapped regions of the State where historic fill is known to exist.

If fill is known to have existed prior to 1988, even if it is identified as contaminated, it is defined as historic fill and there is no obligation to clean it up or delineate it. However, if you dig it up, and send it offsite, it must be sampled, analyzed, and characterized as a waste, unless sampling demonstrates that the material meets clean fill standards.

Also, in PA, if materials were buried or used to fill an area prior to 1980, it may not be classified as a waste at all, since it pre-dated Pennsylvania’s Solid Waste Management Act (Act 97).

Final Thoughts
The discovery of contaminated historic fill can introduce unwanted delays and significant cost increases to a development project. The extent of these impacts can be affected greatly by the particular State in which the project is being conducted, especially in Pennsylvania and New Jersey. Therefore, it is important to have a strong understanding of fill management policies and regulations, before digging into your real estate development project.

Project delays and cost increases can be avoided, or at least managed, by including historic fill evaluations as part of your environmental and geotechnical due diligence studies. By considering the potential presence of historic fill upfront, and incorporating its presence into your preliminary site design, you can avoid costly surprises during the project, and stay on-time and in-budget.

If you have questions regarding the management of historic fill, or other related issues, you may contact David Farrington, P.G. at dfarrington@brickhouse-environmental.com, or Alfred Yates, P.E. at ayates@brickhouse-environmental.com for further detail. Or feel free to call us at 610-692-5770.

Filed Under: Technical Articles

Primary Sidebar

Stay Informed

Thanks for signing up!

To stay informed and up to date on important regulations, technical guidance, and news, please join our email list

 

Our Services

Site Remediation
Environmental Due Diligence
Solid Waste Management
Industrial Compliance
Water Resource Management
Expert Testimony & Litigation Support
Heating Oil Clean-ups
Risk Assessment

Contact Us

515 South Franklin Street
West Chester, PA 19382
610-692-5770 (Phone)
610-692-8650 (Fax)
brickhouse@brickhouse-environmental.com

Testimonials

Michael, I am so pleased with the response time, and thoughtfulness of your effort and Brickhouse in general. I wasted a LOT of time with other environmental companies. I guess it’s never too late. I plan on working for another 20+ years. Both you and Doug have been fantastic.

Jack B.
 

Dave, Very solid and professional work Dave. Thank you for everything.

– Dan W.
 

Paul, Thanks for your excellent work and planning for this. Glad it is done!

– Phillip R.
 

Your field staff were awesome. Steve is especially sharp and communicates well with the client and attorneys.
The whole crew inspired confidence, and made a strong impression that Brickhouse is a quality outfit.

– Sam C. and Mark R.
 

Excellent job to all at Brickhouse! Yet another successful project, nice work! Thank you.

– Scott E.
 

The loan went through! Thanks for all that you have done for us, you did an amazing job!!!

– Pete S.
 

We officially sold the home. We thank you and appreciate what you have done to ease the transition. Your expertise is duly noted and it was nice working with you.

– Joseph P.
 

It was a pleasure working with you guys… I will definitely call again when we run into any environmental issues on our projects.

– Steven O.
 

You did an absolutely incredible job. I am so impressed by the level of detail in the report. Thank you so very much.

– David T.
 

Thanks Paul and company, great job.

– Richard B.
 

Your work has been excellent and I will be very happy to continue our relationship going forward.

– Gordon M.
 

Thanks for the status updates, I got out there as they were working on the newly uncovered well. Nice guys out there, personable and professional.

– Gary P.
 

Thank you very much for your assistance in my tank removal project. Your managers and field crew were a pleasure to work with.

– Chris M.
 

Thanks Michael, you did a fantastic job on this report, and made my life a lot easier.

– Brian B.
 

Thanks so much for your continued great work on this project. We are impressed with your work.

– Michael H.
 

Dave Farrington and Brickhouse have worked with Action Manufacturing Company as consultants on our Environmental projects with excellent results.

– Randy A.
 

I want to thank you and Brickhouse for your help throughout this process. I will recommend you to everyone that requires environmental services. Your company is truly professional. Thanks again.

– Tommy M.
 

Thanks Dave. Outstanding effort by you and your team in getting this done.

– Richard F.
 

I just heard from my colleagues in Philadelphia about the case.  They had nothing but praise for the effort your firm contributed.  Thanks for stepping up to this project at the last minute.

– John C.
 
  • Facebook
  • Instagram
  • LinkedIn
  • Twitter
Serving PA, NJ, DE, NY & Beyond

Copyright © 2023 · Brickhouse Environmental