• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

Call Us Today: 610-692-5770

Serving PA, NJ, DE, NY & Beyond

  • Facebook
  • Instagram
  • LinkedIn
  • Twitter
Brickhouse Environmental

Brickhouse Environmental

Sound Science. Trusted Advice.

  • Home
  • About Us
    • History
    • Principal Bios
    • Senior Management Staff
    • Careers
    • Giving Back
    • The Golden Brick
  • Services
    • Site Remediation
    • Environmental Due Diligence
    • Solid Waste Management
    • PFAS
    • Water Resource Management
    • Expert Testimony/Litigation Support
    • Heating Oil Clean-ups
    • Risk Assessment
    • Industrial Compliance
  • Projects
    • Gallery
  • News
    • Technical Articles
  • Resources
  • Contact Us
    • Request Brickhouse Vault Access

ACT 2

Pennsylvania regulatory Updates

March 31, 2020

Soil Excavation on a Brownfield site in a city setting

Brownfields and Voluntary Cleanup (Act 2) Program

On February 15, 2020, Pennsylvania’s Environmental Quality Board (EQB) published proposed amendments to Pennsylvania’s Land Recycling and Remediation Standards (Act 2) Regulations.

The proposed amendments , published in the Pennsylvania Bulletin, include the following:

  1. PFAS: Statewide Health Standards (SHS) will be added for Perfluorooctanoic Acid (PFOA), Perfluorooctane Sulfonate (PFOS), and Perfluorobutane Sulfonate (PFBS).  Previously unregulated, Pennsylvania will now adopt the USEPA Health Advisory Limit of 70 ng/L for PFOA and PFOS combined.
  2. Other Statewide Health Standards: The SHS for many organic and inorganic compounds will be updated based on the latest scientific information. Most notably, the Ingestion Factor for groundwater has been increased by 20% for both residential and non-residential exposure scenarios, due to people’s increased desire to hydrate. Groundwater ingestion factors have been increased from 2.0 L/day to 4 L/day for residential intake, and 1.0 to 1.2 L/day for non-residential intake, resulting in lower SHSs for many compounds.
  3. Total PCBs in Soil: Numeric values would be calculated for total polychlorinated biphenyls in soil. PCPG reports that the Department agrees with the Cleanup Standards Science Advisory Board’s suggestion to keep the individual Aroclors in all of the tables, including Table 5A. Unfortunately, the incorrect version of Table 5A was provided to, and approved by, the EQB and the correction will be made prior to publication of the Final Rulemaking and an explanation for the correction will be provided in the Comment Response document.
  4. Professional Seals: This proposed new section mirrors language from § 245.314 (relating to professional seals) of the storage tank regulations, requiring that reports submitted to the Department which include professional geologic or engineering work be sealed by a professional geologist or engineer.

The 60-day public comment period for this proposed rulemaking ends on April 14, 2020.

Although the new standards have not yet been formally adopted, they should already be taken into consideration during Phase I and Phase II environmental due diligence assessments.

Proposed Amendments
PADEP suggests using CAPS as engineering tools

Act 2 Technical Guidance Manual – The Use of Caps as Engineering Controls

PADEP plans to finalize and publish an Appendix to the Act 2 TGM providing guidance for the use of caps as engineering controls. The planned release date is March 2020. The document will apply solely to the use of caps in attaining an Act 2 standard. It will be guidance, not regulation, and will be provided to inform remediators of recommended best practices.
The document will include guidance on cap design, construction materials, demarcation layers, documentation, maintenance, inspections, and reporting.


Look for this guidance policy to be published soon in the Pennsylvania Bulletin, followed by a 30-day public notice period for comment. Upon approval, the policy will be appended to the Act 2 TGM. For those who can’t wait, click the link below.

Environmental Cleanup -Brownfields

Management of Fill Policy

As discussed in our January 2020 Newsletter, the PADEP’s new Management of Fill Policy went into effect on January 1, 2020. Some important take-aways include:

  • The new Policy eliminates the previous numeric standards (Table GP-1), which were developed in 2004. It replaces them with Act 2 Statewide Health Standards – the lower of the current residential direct contact numeric values for soils and the residential generic soil-to-groundwater numeric values. Consequently, the clean fill standards will automatically be updated when the Act 2 regulations are next amended (see update above).
  • The amount of lab testing required for “Clean Fill” determinations can be significantly reduced through “due diligence”. Your trusted environmental professional can help you to determine how much due diligence is needed, how much it can potentially save in lab costs and time, and whether it’s worth it.
  • Once it is determined that fill material meets the definition of “clean fill”, a Certification of Clean Fill form (FP-001) must be filed electronically with PADEP (for informational purposes but not approval) before the fill material is transported to the receiving site. Beware – PADEP can review your FP-001 submission, after the fact, and come back to you if they don’t think that it’s sufficient. Therefore, it’s important to properly cover your bases before sending fill offsite.
  • A clean fill determination can be made if it is shown that the concentrations of analytes exceeding the relevant Act 2 standards are actually below background concentrations in soils in the area of the site. However, not only must the fill material be shown to meet background concentrations from the donor site, they must also be shown to meet background concentrations for the receiving site in order to send the material to that property.
Management of Fill Policy
Clean Fill Form (FP-001)

Fill material permitting

Regulated Fill – PADEP General Permit No. WMGR096

If fill material is determined to not meet clean fill standards, it may still meet “regulated fill” standards, which can still provide significant project cost savings when compared to sending the material to a landfill.

Since the material contains compounds above clean fill standards, regulated fill is still classified as a residual waste.  Therefore, it must be managed properly – in accordance with General Permit No. WMGR096 (hot link?).  This general permit was scheduled to expire on December 23, 2019 but couldn’t be modified for reissuance until after the new Management of Fill Policy was finalized.  Therefore, WMGR096 was extended in its existing form until June 23, 2021.

PADEP says that they plan to release proposed modifications to General Permit No. WMGR096 in the 2nd Quarter of 2020.  Stay tuned…

Filed Under: Read More, Site Remediation, Technical Articles Tagged With: ACT 2, brownfields, Site Remediation

Primary Sidebar

Stay Informed

Thanks for signing up!

To stay informed and up to date on important regulations, technical guidance, and news, please join our email list

 

Our Services

Site Remediation
Environmental Due Diligence
Solid Waste Management
Industrial Compliance
Water Resource Management
Expert Testimony & Litigation Support
Heating Oil Clean-ups
Risk Assessment

Contact Us

515 South Franklin Street
West Chester, PA 19382
610-692-5770 (Phone)
610-692-8650 (Fax)
brickhouse@brickhouse-environmental.com

Testimonials

Michael, I am so pleased with the response time, and thoughtfulness of your effort and Brickhouse in general. I wasted a LOT of time with other environmental companies. I guess it’s never too late. I plan on working for another 20+ years. Both you and Doug have been fantastic.

Jack B.
 

Dave, Very solid and professional work Dave. Thank you for everything.

– Dan W.
 

Paul, Thanks for your excellent work and planning for this. Glad it is done!

– Phillip R.
 

Your field staff were awesome. Steve is especially sharp and communicates well with the client and attorneys.
The whole crew inspired confidence, and made a strong impression that Brickhouse is a quality outfit.

– Sam C. and Mark R.
 

Excellent job to all at Brickhouse! Yet another successful project, nice work! Thank you.

– Scott E.
 

The loan went through! Thanks for all that you have done for us, you did an amazing job!!!

– Pete S.
 

We officially sold the home. We thank you and appreciate what you have done to ease the transition. Your expertise is duly noted and it was nice working with you.

– Joseph P.
 

It was a pleasure working with you guys… I will definitely call again when we run into any environmental issues on our projects.

– Steven O.
 

You did an absolutely incredible job. I am so impressed by the level of detail in the report. Thank you so very much.

– David T.
 

Thanks Paul and company, great job.

– Richard B.
 

Your work has been excellent and I will be very happy to continue our relationship going forward.

– Gordon M.
 

Thanks for the status updates, I got out there as they were working on the newly uncovered well. Nice guys out there, personable and professional.

– Gary P.
 

Thank you very much for your assistance in my tank removal project. Your managers and field crew were a pleasure to work with.

– Chris M.
 

Thanks Michael, you did a fantastic job on this report, and made my life a lot easier.

– Brian B.
 

Thanks so much for your continued great work on this project. We are impressed with your work.

– Michael H.
 

Dave Farrington and Brickhouse have worked with Action Manufacturing Company as consultants on our Environmental projects with excellent results.

– Randy A.
 

I want to thank you and Brickhouse for your help throughout this process. I will recommend you to everyone that requires environmental services. Your company is truly professional. Thanks again.

– Tommy M.
 

Thanks Dave. Outstanding effort by you and your team in getting this done.

– Richard F.
 

I just heard from my colleagues in Philadelphia about the case.  They had nothing but praise for the effort your firm contributed.  Thanks for stepping up to this project at the last minute.

– John C.
 
  • Facebook
  • Instagram
  • LinkedIn
  • Twitter
Serving PA, NJ, DE, NY & Beyond

Copyright © 2023 · Brickhouse Environmental